Our Notable Projects
- Home
- Projects
π 2025
									π 2024
									π 2023
									π 2022
									π 2021
									π 2020
									π 2019
									π 2018
									π 2017
									π 2016
									π 2015
									π 2014
							π 2025
					- UPGRADE CONTROLLER FDGS GT 2015 UC DAN INTEGRASI PLC TMR GT 2015 UC β PERTAMINA REFINERY UNIT II PLAJU, JAN 2025
- UPGRADE PLC AIE DRYER 204-D-001 β TPPI TUBAN, JAN 2025
π 2024
					- SURGE PROTECTION 52G501ABC – PERTAMINA REFINERY UNIT IV CILACAP, JAN 2024
- MAIN PROCESSOR MODULE MFR. SCHNEIDER ELECTRIC – PERTAMINA REFINERY UNIT IV BALONGAN, MAY 2024
- PENGADAN SPARE PART COMPRESSOR HANHWA PROJECT NO. 038939 – PERTAMINA REFINERY UNIT IV DUMAI, SEP 2024
- PEMASANGAN ALARM MANAGEMENT SYSTEM (AMS) KILANG RUIII β PERTAMINA REFINERY UNIT II PLAJU, DEC 2024
- UPGRADE CONTROL DAN VIBRATION MONITOR CENTAC AIR COMPRESSOR 2025 JA, JB DAN 2027 JB, JC UTILITIES PLAJU β PERTAMINA REFINERY UNIT II PLAJU, DEC 2024
π 2023
					- PENGADAAN 25 AUTOMATIC TANK GAUGING – PERTAMINA REFINERY UNIT IV CILACAP, JAN 2023
- UPGRADE FIRMWARE TRICONEX KEL-I,II,III & XII PS 2023 – PERTAMINA REFINERY UNIT II DUMAI, FEB 2023
- ENGINEERING SERVICE FOR TRICONEX HGPI GAS TURBINE 2015 UA – AUX HYDRAULIC PUMP – PERTAMINA REFINERY UNIT II PLAJU, JUL 2023
π 2022
					- PENGGANTIAN LEVEL TRANSMITTER 22-LT-104, 22-LT-105, 22-LT-106 DAN 22-LT-108 – PERTAMINA REFINERY UNIT III PLAJU, JUL 2022
- UPGRADE CONTROL DAN VIBRATION MONITOR CENTAC 2025 JC & 2027 JA – PERTAMINA REFINERY UNIT III PLAJU, NOV 2022
- PENGADAAN MATERIAL DAN RE-CONFIGURATION SAFETY INSTRUMENTED SYSTEM REVAMPING (200-PSS-001 DAN 200-PSS-002) – PT TRANS PACIFIC PETCHEMICAL INDOTAMA (TPPI), OCT 2022
- MATERIAL MODICON SPAREPART SUPPORT TSA FDGS β PERTAMINA REFINERY UNIT V BALIKPAPAN, OCT 2022
π 2021
					- PEMASANGAN 56 UNIT UNIT ATG CUSTODY TRANSFER OIL MOVEMENT – PERTAMINA REFINERY UNIT III PLAJU, JUL 2021
- RETROFIT ATG TAHAP II – PERTAMINA REFINERY UNIT II SEI PAKNING, DEC 2021
- UPGRADING EMERGENCY SHUTDOWN (ESD) DI OS11,12,13 & OCCR DARI SYSTEM RELAY KE SYSTEM PLC BASED TA MAJOR – PERTAMINA REFINERY UNIT VI BALONGAN, DEC 2021
π 2020
					- UPGRADE DCS GROUP VI-HSC, UPGRADE DCS GROUP VII-UTL EXISTING, & SEGREGATION DCS GROUP III-HANS MAJOR – PERTAMINA REFINERY UNIT II DUMAI, APR 2020
- UPGRADE SYSTEM CONTROL STEAM TURBINE 905-TG-3 – PERTAMINA REFINERY UNIT II DUMAI, APR 2020
- PENGGANTIAN SURGE PROTECTION DEVICE DI AREA N2 PLANT, IA DAN DPA UTILITIES RFCC – PERTAMINA REFINERY UNIT IV CILACAP, SEP 2020
- PENGANTIAN CONTROLLER MARK V (GE) DAN ENGINEERING WORKSTATION GAS TURBINE GT-2015UB UTILITIES β PERTAMINA REFINERY UNIT II PLAJU, OCT 2020
- LIGHTNING ARRESTER SURGE COUNTER DCS GROUP IV – PERTAMINA REFINERY UNIT II DUMAI, NOV 2020
π 2019
					- RETROFIT ELECTROMECHANICAL RELAY SS#05 SG, SS#06 SG & INTEGRATION AUTOMATION SUBSTATION – PERTAMINA REFINERY UNIT III PLAJU, MAR 2019
- RETROFIT SYSTEM DCS UNIT CDU V – PERTAMINA REFINERY UNIT III PLAJU, APR 2019
- UPGRADE SYSTEM CONTROL STEAM TURBINE 905-TG-5 – PERTAMINA REFINERY UNIT III PLAJU, JUN 2019
- PENGUKURAN VOLUME STOCK GREEN COKE DENGAN LASER SCANNER DI AREA HEAVY OIL COMPLEX & OIL MOVEMENT – PERTAMINA REFINERY UNIT II DUMAI, NOV 2019
π 2018
					- SUPPLY TRICONEX PART PLANT STOP 2018 – PERTAMINA REFINERY UNIT II DUMAI, MAR 2018
- RETROFIT MECHANICAL GOVERNOR TO ELECTRICAL GOVERNOR TURBINE 211-CT-2A & 211-CT-2B PLANT STOP 2018 – PERTAMINA REFINERY UNIT II DUMAI, APR 2018
- REPLACEMENT CONTROLLER MARK-V (GE) & ENGINEERING WORKSTATION GAS TURBINE GT-2015 UC UTILITIES – PERTAMINAΒ REFINERY UNIT III PLAJU, JUL 2018
π 2017
					- REPLACEMENT PLC ESD SYSTEM CDU II & CDU IV KILANG PLAJU – PERTAMINA REFINERY UNIT III PLAJU, JUL 2017
- TSA (DCS) FOXBORO 1/A SERIES & EVO PERIODE 2017 β 2019 (2 TAHUN) – PERTAMINA REFINERY UNIT II DUMAI, JUL 2017
- SUPPLY TRANSFORMER 10 MVA TAG. NO. T1-4 & T2-4 – PERTAMINA REFINERY UNIT II DUMAI, DEC 2017
π 2016
					- INSTALLATION FIELD DEVICE INDEPENDENT HIGH LEVEL ALARM (IHLA) FOR 13 TANK IN OIL MOVEMENT AREA – PERTAMINA REFINERY UNIT VI BALONGAN, MAY 2016
- UPGRADING CONTROLLER TRICONEX 9.3.1. RGT/WGC – EGT/MAB-CAB KILANG FCCU RU – III SUNGAI GERONG – PERTAMINA REFINERY UNIT III PLAJU, MAY 2016
- UPGRADE WORKSTATION DCS & SCADA UTILITIES & CD&L AREA – PERTAMINA REFINERY UNIT III PLAJU, JUL 2016
- INSTALLATION TANK OVERFILL PROTECTION INDEPENDENT HIGH LEVEL ALARM SYSTEM (IHLA) FOR 44 TANK – PERTAMINA REFINERY UNIT III PLAJU, DEC 2016
- INSTALLATION 20 UNIT ATG (AUTOMATIC TANK GAUGING) OIL MOVEMENT PLAJU PHASE II – PERTAMINA REFINERY UNIT III PLAJU, DEC 2016
π 2015
					- PEMASANGAN THERMOCOUPLE CABLE TURNAROUND CDU V KILANG PLAJU β PERTAMINA REFINERY UNIT III PLAJU, JANUARI 2015
π 2014
					- INSTALLATION CHLORINE SENSOR PADA UNIT WTP DAN RWC 2 UTILITIES PLAJU β PERTAMINA REFINERY UNIT III PLAJU, AGUSTUS 2014